Learning Center Navigation Servers Plans Scenarios Steps Scheduling Analysis

  1. Make sure you’re on the Run tab.
  2. Next click the Add Load Test button.
  3. Then fill in the details of when you want to run your test.
    • See additional information below regarding scheduling options.

  4. Finally click Save.

Additional Information

  • The check box for starting the test as soon as possible will get the cloud severs going after about a 5-15 minute build time depending on the size of the test.
  • The drop-down options for linear and step-up control the rate at which users increase during the test. Linear will add 1 at a time while step-up will increase by a set number every number of set minutes.

Similar Posts